Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.
Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.
SL No. | Description | Drawing Size | No. of Sheets |
1 | Electrical Drawings | ||
1.0 | Metering & Protection SLD for 33/11KV substation. | A3 | 1 |
1.1 | Single line diagram of 415V ACDB | A3 | 1 |
1.2 | Single line diagram of 110V DCDB | A4 | 1 |
1.3 | Single line diagram of 415V Main | A4 | 1 |
Lighting distribution | |||
1.4 | Single line diagram of 415V BMK | A4 | 1 |
2 | Layout Drawings | ||
2.1 | Electrical Layout plan & elevation for 33/11KV substation. | A3 | 1 |
2.2 | 3D layout plan and elevation of 33/11kV BIM substation | A0 | 1 |
2.3 | 3D layout plan and elevation of 33/3.3kV proposed Switchyard at Gua Mines | A0 | 1 |
2.4 | 3D layout plan and elevation of 33/3.3kV HN-16 Switchyard at Gua Mines | A0 | 1 |
2.5 | Earthing Layout for 33/11KV substation. | A3 | 1 |
2.6 | Cable trench Layout for 33/11KV substation. | A3 | 1 |
2.7 | DSLP Layout for 33/11KV substation. | A3 | 1 |
2.8 | Equipment and Cable trench layout of Control Room. | A3 | 1 |
2.9 | Outdoor Illumination Layout for 33/11KV substation. | A3 | 1 |
2.10 | Illumination and Conduit Layout for Control Room. | A3 | 2 |
2.11 | Earthing Layout for Control Room. | A3 | 1 |
2.12 | Erection Key Diagram for switchyard with BOQ of clamps and connectors. | A3 | 1 |
2.13 | Earthing notes and details | A3 | 15 |
2.14 | Lighting notes and details | A3 | 5 |
2.15 | Power Cable schedule and interconnection | A4 | 1 |
2.16 | Control Cable schedule and interconnection | A4 | 1 |
2.17 | Preparation of BOQ of cables, cable tray, conduit, lighting, earthing, lightning protection, conductor, AL tubes, clamps and connectors, Insulators. | A4 | 1 |
3 | Design Calculations | ||
3.1 | Earthing calculation for 33/11KV substation. | A4 | 1 |
3.2 | DSLP calculation for 33/11KV substation. | A4 | 1 |
3.3 | Outdoor illumination calculation for 33/11KV substation. | A4 | 1 |
3.4 | Control room illumination calculation for 33/11KV substation. | A4 | 1 |
3.5 | Cable Sizing Calculation | A4 | 1 |
3.6 | PS class CT sizing calculation | A4 | 1 |
SUB TOTAL FOR ELECTRICAL | |||
4 | CIVIL Drawings & Design Calculations | ||
4.1 | Architectural layout, Foundation Plan & Elevation for Control room. | A2 | 3 |
4.2 | Foundation Plan & details for Boundary wall. | A3 | 1 |
4.3 | Foundation Plan & details of 33KV Current Transformer. | A4 | 1 |
4.4 | Foundation Plan & details of 33KV Potential Transformer. | A4 | 1 |
4.5 | Foundation Plan & details of 30KV Lightning Arrester. | A4 | 1 |
4.6 | Foundation Plan & details of 33KV Isolator. | A4 | 1 |
4.7 | Foundation Plan & details of 33KV VCB. | A4 | 1 |
4.8 | Foundation Plan & details of 11KV Current Transformer. | A4 | 1 |
4.9 | Foundation Plan & details of 11KV Potential Transformer. | A4 | 1 |
4.10 | Foundation Plan & details of 11KV Lightning Arrester. | A4 | 1 |
4.11 | Foundation Plan & details of 11KV VCB. | A4 | 1 |
4.12 | Foundation Plan & details of 33KV Bus gantry tower. | A3 | 1 |
4.13 | Foundation Plan & details of Shielding tower. | A3 | 1 |
4.14 | Foundation Plan & details of 7.5 MVA Transformer. | A1 | 1 |
4.15 | Layout Plan & Section of Drain. | A3 | 1 |
4.16 | Layout Plan & Elevation of outdoor cable trench and cover slab | A3 | 1 |
4.17 | Details of Fence and Fence gate | A3 | 1 |
4.18 | Details of Main gate | A4 | 1 |
4.19 | Details of Septic tank and Soak pit (of Control building) | A3 | 1 |
4.20 | Layout plan and details of water supply arrangement and OH tank | A3 | 1 |
4.21 | Civil Design calculations | A4 | 1 |
4.22 | Overall foundation layout of Switchyard | A2 | 1 |
SUB TOTAL FOR CIVIL | |||
5 | STRUCTURAL GA Drawings & Design Calculations | ||
33KV : | |||
5.1 | GA drawing of 33kV Line gantry tower | A2 | 1 |
5.2 | GA drawing of 33kV Line gantry beam | A2 | 1 |
5.3 | GA drawing of support structure for 33kV Isolator with and without E/S | A3 | 2 |
5.4 | GA drawing of support structure for 33kV LA | A3 | 1 |
5.5 | GA drawing of support structure for 33kV CT | A3 | 1 |
5.6 | GA drawing of support structure for 33kV BPI | A3 | 1 |
5.7 | GA drawing of support structure for 33kV PT | A3 | 1 |
5.8 | GA drawing of Shielding tower | A2 | 1 |
5.9 | Design calculation for 33kV structures | A4 | 1 |
11KV : | |||
6.1 | GA drawing of support structure for 11kV LA | A3 | 1 |
6.2 | GA drawing of support structure for 11kV CT | A3 | 1 |
6.3 | GA drawing of support structure for 11kV BPI | A3 | 1 |
6.4 | GA drawing of support structure for 11kV PT | A3 | 1 |
6.5 | Design calculation for 11kV structures | A4 | 1 |
Himachal Pradesh - 220/132/22kV Switchyard including 80/100MVA Power T..
Himachal Pradesh - 66/11kV Switchyard for Design, Build, Operate contr..
West Bengal - Complete Design, Engineering and Project management serv..
Jharkhand - Addition of 4 nos. 33kV feeder bays and replacement of two..