• Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

Afghanistan - Detail engineering of 220/20kV Transformer bay extension at Khost Substation and 20kV Overhead line from Khost to Camp Clark in Khost Province

1.0   Scope of Work

1.1  The scope of services shall include the following design & engineering works for electrical, civil, structural and Substation automation systems of 220/20kV Transformer bay extension at existing Khost Substation and construction of 20kV Overhead line from Khost Substation to 1/203rd ANSF base at Camp Clark HQ, Afghanistan under ‘Afghanistan Electrical Interconnect’ package of US Army Corps of Engineers :

a.   35% Design package comprising of the following :

  1. SLD and Layout plan & elevation of 220/20kV Tr. Bay extension at Khost Substation,

  2. Layout of existing control building showing the new 20kV Switchgear,

  3. Load flow study of power supply to Camp Clark ANSF base,

  4. 20kV Overhead line route layout plan & elevation,

  5. SLD & Layout of 20kV power supply at Camp Clark base,

  6. Technical specifications of equipment and worksStudy of USACE’s comments on 35% design package.

b. 65% design package comprising of all detail engineering drawings for electrical, civil, structural and Substation automation works.

c. Study of USACE’s comments on 65% design package.

d. 99% design package comprising of all revised detail engineering drawings for electrical, civil, structural and Substation automation works.

e. Bid evaluation, clarifications and technical recommendation reports for procurement of equipment /materials.

f.  Review of vendor drawings and approval.

g. Inspection of FAT of equipment/material at manufacturer’s works (on per diem rate basis).

h. Preparation of As Built drawings.