Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.
Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.
Satcon has been appointed Consultants by Electricity Distribution and Supply Authority (EDSA) in Sierra Leone for supervision and control of the CLSG RE project in Sierra Leone. The objective of this assignment is to support the Project Implementation Unit (PIU) established under Ministry of Energy (MOE), Sierra Leone in supervision of construction works and Management of contractor for Supply, Installation, Testing and Commissioning of 33/0.4kV Distribution networks, Overhead lines, Pole mounted Transformers, LV Distribution boards, Prepayment Meters, Service Connections and Street lights in Twenty-nine (29) rural communities. The objective of the supervision consultant is also to ensure (i) High quality construction works is achieved, (ii) All work associated with the project are carried out in full compliance with the design parameters and specifications, (iii) Social and Environmental requirements, safety and monitoring are carried out in accordance with the recommendations of the approved Feasibility Study and the Environment Impact Assessment and, (iv) Works are completed within the agreed timelines.
Satcon has mobilised their team to Freetown and started review of Contractor submitted drawings and documents.
Nepal - 132kV LILO Substation for 2 x 12.9MVA Hydro Electric Power Pla..
USA - Electrical Design, Engineering and Consultancy services for Sola..
Nigeria - Detail Design and Engineering services for Upgradation of Tr..
Nigeria - Engineering Design of River Crossing Lattice and Tubular Tow..