brand

SATCON

Extra High Voltage Engineering Consultancy Services

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

Qatar - Electrical system studies, Electrical design calculations, Earthing and Lightning protection calculations and drawings for NPP-0064 package of New Port Project in Qatar (On behalf of Construction Development Company LLC, Qatar)

1.0 Scope of Services

1.1 The scope of work shall include the following design & engineering services for the MV and LV electrical systems of Substation-7 at Port Administration Area and Substation-14 in Port Marine Unit of New Port Project, Qatar under NPP-0064 package :

  • 1. Load flow study.
  • 2. Short circuit and earth fault study.
  • 3. Harmonic analysis.
  • 4. Protective Relay setting & coordination study.
  • 5. Earthing calculation and earthing layout drawings.
  • 6. Lightning protection risk assessment study and zone of coverage calculation, Lighting layout drawings.
  • 7. MV & LV cable sizing calculation.
  • 8. Verification and stamping of MV and LV SLDs, protection SLDs
  • 9. Review of 22kV switchgear vendor drawings.
  • 10. Review of SCS & PMS vendor drawings.

Back to projects