Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.
Scope of Services
1.1 The scope of work shall include the following works for the shifting of 2 nos. 95MVA Generator step up transformers :
a. Isolated Phase Bus Duct (IPBD) sizing calculation including Temperature rise calculation, Forces on Busbar Insulator, Location & Span of busbar, Forces on Bus duct support.
b. Structural drawing of 132kV Gantry for 2 Nos. of 95MVA transformers located side by side.
c. Design calculations for Sag & Tension and Short circuit force acting on the 132kV Gantry.
d. Structural design calculations of the following :
i. 132kV Gantry tower and Beam.
ii. 10.5kV IPBD structural supports.
e. Electrical Layout plan & elevation of the IPBD and Transformer yard.
f. Structural GA drawing of IPBD supports (different types, lattice).
Nepal - Detail engineering of Electrical and Civil works of 132kV Swit..
Nigeria - Preparation of Power and Control cable schedules and Interco..
Nigeria - Detail engineering for Electrical, Civil & Structural works ..
Nepal - Prebid Engineering services for 220kV Lapsiphedi GIS Substatio..