• Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

Satcon begins a new Detail Engineering work for 220/20kV Substation and 20kV Overhead line in Afghanistan

Satcon is proud to announce that M/s Masterlogist Construction Group (MCG), Herat, Afghanistan has gracefully awarded Satcon the Consultancy work for detail engineering of 220/20kV Substation extension at existing Khost Substation, Installation of new 20kV Substation at Khost Substation, 20kV D/C Overhead line between Khost Substation and 1/203rd Headquarters Camp Clark ANSF Base in Khost Province. MCG is the main contractor in this project engaged by US Army Corps of Engineers (USACE). We thank MCG for considering us fit for this prestigious project. We wish a successful completion of this project and would be glad to contribute to the Afghan cause.

(Photo is indicative only)