SATCON
ISO 9001-2008 Certified
(Design, Engineering and Consultancy Services for EHV Substations, EBOP of Thermal Power Plants and Large Electrical Systems of Steel plants, Coal & Iron Handling Plants and Misc. Industries)

satcon iso
  • D & B
  • Smera

Our Project

  • project name

    Basic and Detail Engineering services for 132/33kV AIS Substation at Song and 2x132kV line bay extension at existing 330/132kV Yola substation of TCN (Transmission Co. of Nigeria) in Nigeria (On behalf of Qingdao Wuxiao Group Company and Ahmin Technology & Power Systems Ltd J.V)

    The project includes preparation of following drawings and design calculations :

    1. Protection and metering SLDs of 220/132/33kV switchyard, 415V LV Switchgear, ACDB, MLDB, ELDB, 220V DCDB, 48V DCDB and Lighting DBs.

    2. Switchyard electrical layout, EKD, cable trench layout, DSLP layout, Earthing layout, Lighting layout drawings.

    3. Control schematics, interlocking diagrams, terminal plans of BMK, CT & PT JBs.

    4. Power and control cable schedule and interconnection diagrams.

    5. Civil drawings for two storied control building, store, DG room, security room, all equipment and tower foundations, cable trenches, drain, road, fence, gate, culverts etc.

    6. Steel structural drawings for towers, beams and equipment support structures.

    7. Substation automation system and PLCC.

    8. All electrical, civil and structural design calculations.

    9. Bid evaluation and recommendations.

    10. Vendor drawing review. 

Back to Project